Skip to main content

Search the Special Collections and Archives Portal

upr000175 537

Image

File
Download upr000175-537.tif (image/tiff; 26.85 MB)

Information

Digital ID

upr000175-537
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    L&s Vegas - January 5* 19^9 « 23-1-55 Mr. L. A. White: C 0 0 - Mr. A. {*. Adamson)* Work Order 612 authorised the oonstraction of water main Into Block 9 of Mayfair Tract #2 under Rule 9-A, at an estimated cost of 32670.00, which was advanced toy the aubdivlder, Richard Toleno. Enclosed la detail of charges to this Work Order, indicating the total cost to he $2292.98, to which should he added XQjS for supervision and overhead, making the total #2522.28. We attach Form 183 cover­ing this difference between the estiaated cost and actual cost, $1 ^7.72, and if this agrees with your figures, woUld you kindly send Mr. Toleno a refund voucher in this amount. The Work Order was started December 23rd and completed December 31at and followed lines of print attached to Work Order. For the benefit of our depreciation schedule, following is the diameter and cost of pipe. 6-inch Pipe 720 Feet $2292.98 A. M. Folger * The installation followed lines of print except that we commenced with a connection with the existing Tee on the east side of Bruce Street instead of the West side? and Installed the first 330* on the east side of Bruce then crossed over at right angles to the west side to enter the block* This to avoid breaking the line and Installing an additional Tee on the west side of Bruce.