Skip to main content

Search the Special Collections and Archives Portal

upr000103 146

Image

File
Download upr000103-146.tif (image/tiff; 23.81 MB)

Information

Digital ID

upr000103-146
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Z O ' ) l Los Angeles - April 9, 1956 /f.^' Mr. E. E. Bennett - Los Angeles: (cc - Mr..V. W. Smith - Los Angeles) Please refer to your letter of March 8, file 80-11, regarding Mr. Smith’s letter of March 6, his file 33^» relative to completion of work required to be done t y Las Vegas Valley Water District under an outstanding contract. between points A and V. / The easement for this pipe line is covered in UPHR Audit 80405, C.L.D.VJL1342 on page 8 as (k-10). The easement is further referred to as #1 of Easement Strip 10 in Exhibit MF" of said contract. This easeraentTwas^conveyed~to Las" Vegai~Valley Water District b y Grant of Easement dated June 1, 1954 and identified as LA&SL Deed Audit No. 5352. The easement is described in this grant as being #1 of Easement Strip 9 Renshaw, Engineer and Manager of Las Vegas Valley Water District. Mr. Renshaw now advises us that the pipe line mentioned in explanation under paragraph (h) on page 2, and the pipe mentioned in first explanatory paragraph under paragraph (3) on page 3 of Mr. Smith's letter, have now been removed. I assume that you will handled Mr. Renshaw* s request as to the release of the Relocation Fund. Tour question regarding the second paragraph under sub-paragra] (a) in Mr. Smith's letter concerning pipe line which was not constructed I am attaching copy of letter received today from Mr. W. C. Att