Skip to main content

Search the Special Collections and Archives Portal

upr000092 46

Image

File
Download upr000092-046.tif (image/tiff; 26.31 MB)

Information

Digital ID

upr000092-046
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Loe Angeles, <JUne 5 , 1952 Mr. %n« Reinhardt t (CG - Mr. R. L, Adamson s ' Mr. 1. E. Bennett) ^ Referring to the matter of negotiations with Las Yogas Valley Water District regarding sale of eater and power facilities at Las Vegas, Nevada, and your request that data be developed for use in possible negotiations with the District for the relocation or removal of existing water transmission mains and power lines located on undeveloped LA&SLRRCo. proper­ty lying between Railroad Company’s shop grounds and Clark Street Reservoir #1 eo that this property might be clear of obstructions and become suitable for residential or industrial development t X have prepared a suggested plan for the rearrange­ment of water pipe lines in area referred to above, together with an estimate of cost, and am also suggesting for study and estimate a plan to rearrange the power lines, which X believe can be worked out with the assistance of our llsctrlcal Depart­ment in Omaha. Referring to attached map I-128, dated June 5, 1952, two copies of which are attached hereto, the above plans are outlined, as follows) I - Pipe Lines Construct 8370 feet of new pipe line consisting of 6900 ft. of 56” and 1570 ft. of 24” concrete cylinder pips, replacing 13,600 ft. of existing pips lines, as indicated on attached map. (;}) Estimated cost to construct 8270 ft* of pipe line in new location replacing 15,600 ft. of existing lines New pipe lines, 8270 lin* ft. Valves, etc. Remove & salvage existing pipe Relocate Vest Side Pumping Sta. Total In making above estimate, several kinds of pipe were considered, and the 24” and 56” concrete pipes indicated on map were selected as being superior to and cheaper than several other kinds, #165,500 10,500 56,900 2,000 #252,500