Skip to main content

Search the Special Collections and Archives Portal

upr000267 3

Image

File
Download upr000267-003.tif (image/tiff; 23.37 MB)

Information

Digital ID

upr000267-003
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    // F a cilitie s proposed by Greeley and Hansen in report dated October, 19ij-9. To Be Constructed in 1950: Transmission water main consisting o f 20” and 2” steel pipe from B.M.I. plant at Henderson, Nevada, via Pittman to 6th and Oakey Streets, Las Vegas. Booster Station No. 3 at Junction near Pittman and in sta ll 1 - Booster Pump £(30 H.P. Unit 10 MGD. Pumping Station, 6th and Oakey Street, and in sta ll k - 250 H.P. Units 10.5 MGD each. Ground Level Storage, 6th and Oakey Street, 1| MG Elevated Storage " ” ” ” 500,000 Gal. Feeder water main consisting of 30” steel pipe from 6th and Oakey Streets to 9th and Stewart Streets; l o ” steel pipe from v icin ity of Washington St. to North Las Vegas. Construct power transmission lin e and equipment. To Be Constructed in 1958: Intake structure Lake Meade including ij. - 300 HP pumping units 10 MGD each. 5V r steel pipe lin e from intake structure to intake reservoir near Lake Meade. Intake reservoir 1.0 MG capacity. Transmission water main consisting o f ij.0” steel pipe from Booster Station near intake reservoir to Junction point near Pittman. Booster Station No. 1 at intake reservoir, including 1+ - 500 HP units 10 MGD each. Remaining 3 - 500 HP units 10 MGD each and 1 - 1000 HP unit (return pump from Junction point near Pittman to B.M.I.) 8 MGD at Booster Station No. 3 at Junction near Pittman. Las Vegas Valley Water D istrict Las Vegas, Nevada