Skip to main content

Search the Special Collections and Archives Portal

upr000092 77

Image

File
Download upr000092-077.tif (image/tiff; 33.22 MB)

Information

Digital ID

upr000092-077
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    The right to construct said pipe line shall include the right to construct pumps, valves, connections and appur­tenances. It is mutually understood and agreed that the es­timated cost of said pipe lines hereinabove in this section referred to, including all appurtenances and pumping stations, is 1300,000.00, this sum being an estimated cost, the actual a mount of said final cost to be determined upon the completion of said pipe line facilities and pumping station. Section V3\>v n"(Co>ssftc” as hereinabove in Section 2 re-ferred to shall include the actual cost of construction of said pipe lines plus the following items: (a) 10$ of labor for supervision. (b) 3$ of labor, fori vacation allowance. (c) 6$ of labor plu^\ vacation allowance for Railroad Retirement and '^Unemployment Insurance Taxes. (d) 1 5$ of labor plus %^ttion allowance for Rental of Equipments ? H ! I / (©) 7s$ of l? -a1b o/r p' lus vaV ca' t- i• o?n allowance for Dining Car and Hotel deficiency. (f) 10$ of cost of new material for handling new ma­terial/* (g) 10$ of total for contingencies, both labor and material