Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
N -s- Beeause the leaser hei^it (about 201 feet) that the pumping plant at the Lake will have to lift the water a much greater capacity ia created so that the same pumping plant at the Lake will deliver fifty million gallons of water a day to the reservoir at Manganese ©res, from Manganese Ores Reservoir a new pumping plant comparatively cheap is cost, will deliver water through the 2Gl-foot lift* to the %nderson Reservoirs in more than ample quantities to meet all their possible requirements. From Manganese ©res Reservoir, a gravity flow pipeline built along the eastern slope of Las Vegas Talley will deliver an ample supply of water to a standpipe near Charleston Boulevard east of Las Vegas. From this standpipe the water may readily and cheaply be pumpred to the mains of the Las Vegas Water System La any quantity needed. An important part of the project so far as the government is concerned is the ^Exchange Water Concept8, fhis means that in case of any disaster which might put the Lake Mead pipeline out of commission, water from the Lae Vegas artesian water system would flow baok through the pipeline to the Manganese Ores reservoir in sufficient quantities to enable the plants to continue full operation for a reasonable time without closing down, fhls is a most important consideration so far as BMX plant lessees are concerned. the above in brief Is the plan we are proposing to Las Vegas Valley Water district * We believe it is sound and may be properly financed through private channels without necessarily calling for government aid. Yours very truly, Charles P. Squires.