Information
Digital ID
ent000493-031
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.APR-11-1995 11:46 PIPER PRODUCTIONS 407 426 7551 P.03 11. Rio Portal-Ref. Drawing #18A. Cost 12. Rio Portal 71 Wagon - Ref. Drawing # 19A. Cost 13. Portal Renovation - Ref. Drawing 25. Cost 14. Finale Electric Portal - Ref. Drawing #27R_ Cost 15. Jeweled Wagon - Ref. Drawing # 28. Cost 16. Finale Escape Steps-Ref. Drawing #30. Cost $ 8,586.00 $ 9.570.00 $ 6,734.00 $ 14,480.00 $ 20.832.00 $ 5,528.00 I TOTAL CONSTRUCTION SERVICES""-" j $ 170,536.00 | II. RENTAL SERVICES - None Requested III. TRANSPORTATION SERVICES - FOB PPI Dock IV. PERSONNEL SERVICES Note: The cost of personnel services is an estimate only based upon the Clients description of requirements. Actual cost, as shown m PPfs final invoice to Client, may be higher or lower than shown here. Estimates are based on unrestricted access to the job site and timely provision of all necessary support services; any delays caused by other than PPI will constitute a change order payable by Client upon presentation of invoice. 1, Lead Carpenter - $400/day at (10} hours per day. Plus Travel, Per diem and Hotel Accommodations (Single Room). Rates are based on current available pricing and are subject to increase/ decrease based upon actual pricing at time of install. Cost: TBD I TOTAL PERSONNEL SERVICES ESTIMATE n TBD PROJECT TOTAL Florida State 6% Sales Tax will be assessed if FOB PPI Dock TOTAL PROJECT COST 170,536.00 TBD NOTE 1: Standard Payment Terms - 50% At Agreement/ 50% at Delivery. NOTE 2: Receipt of a signed contract and deposit by PPI are necessary prior to purchase of materials and/or commencement of construction of this project NOTE 3: Proposal/Budget estimate and/or costs are valid for fifteen (15) days from document date. SANDCS.00C/ WORD SandCastle Production Shaw 1995/ Guam Page 2 OF 2 TOTAL P.03