Skip to main content

Search the Special Collections and Archives Portal

man000205 80

Image

File
Download man000205-080.tif (image/tiff; 27.18 MB)

Information

Digital ID

man000205-080
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Section 5. After the sale d a t e , the following work shall 1 be performed: (a) The construction of a 39-inch reinforced concrete 3 or concrete cylinder pipe line in location shown by broken red and white line between points marked A and V and V and K on said Exhibit 5 ’'A'* connecting with existing 24-inch cast iron pipe line and 16- 0 inch transite pipe line at point marked A. (b) The construction of a 24-inch cast iron or concrete 8 lined and coated steel pipe line in location shown in broken red and white lines between points marked K and E on Exhibit A , con- 10 necting at point K with the pipe line referred to in subparagraph 11 (a) of this section and at point E with existing 24-inch cast iron 12 pipe line. 13 (c ) The construction of an 8-inch cast iron pipe line in 14 location shown by broken red and white lines between points marked 15 Y and D on Exhibit "A" connecting at point Y with the pipe line 16 referred to in subparagraph (a) of this Section 5 and at point D 17 wit h existing 8-inch cast iron pipe line. 18 (a) The relocation of the pumping station now located 19 at point HH to a new location shown in solid green square on Exhibit 20 "A" near point R. 21 (e ) Construction of a 14-inch cast iron or concrete lined 22 and coated steel pipe line in location shown by red line between 23 points marked S, T and U on Exhibit "A" and extending to a connec- 24 tion with existing 12-lnch cast iron pipe line near point marked S 25 and to a connection with existing 12-inch cast iron pipe in 26 27 28 24.