Information
Digital ID
upr000165-055
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Las Vegas - January 29, Xf48 W 2 > 1 - 4 5 Mr. 0. M. Corys ( oo - Mr. E. E. Bennett Mr. Frank Strong) { We have received advance authority to Install water main In Block 26 of X4th Street Addition under Rule f-j, for B. B. Woody, Contractor, whose address is 811 South Main Street, Las Vegas, Nevada. Will you please promptly prepare Cl) Sfeu&l form of Rule 9-A agreement with Woody, covering construction of this line at an estimated cost of 115 3 0 .00, which amount he has advanced. (2) Labor agreement with Nevada Construction Company covering labor required for its Installation for a consideration of #562.50. fhe description of work to be performed is, •Commencing at a connection with the existing water main at the north end of Block 25, l4th Street Addition, thence northerly through Block 26 a distance of 450 feet to an end at the north end of said Block 26.® fhe installation will be all 6® cast iron pipe, and Block 26, 14th Street Addition, is recorded in look 1 of Plats, Page 82. A. M 8 Folger