Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
CASING? Casing for water well shall extend through 30 inch conductor pipe to a minimum depth of 800 feet arid any additional depth* not to exceed a total of 1200 feet* as directed by the Engineer., Well shall be cased with 16 inch I.D. No. 8 gage double water well casing or 12 inch I.J>. No. 8 gage double water well casing if specified by Engineer in event the Engineer determines it is necessary to reduce size of casing. All casing material shall be Hard Red Steel. Kai-Well Steel or equal. Casing shall be perforated with slots 3/8 X 1-4" for welding at location 12 inches from end of each 4-ft. joint* 5 slots around the circumference for 16" X.D. casing and 4 slots for 12" I.Do casing. In order to case off any possible water from surface drainage or upper stratas circumferential welding of outside joints of casing shall be performed to a depth of 200 ft. below top of well. STARTING SHOE: Contractor shall furnish: 1 * 16" X 16" X 1-i1' bit steel shoe, 16»- 16" No. 8 gauge 3 ply starter* 34s- 16" No. 8 gauge 2 ply starter. Similar material for 12" shoe and starter in event necessary to reduce to 12" casing. PERFORATIONS IN WATER BEARING STRATA: Casing shall be perforated after installation at depth agreed upon by the Engineer and the Contractor. Perforations shall be of the size and type and number as agreed upon by the Engineer and the Contractor. After well has been perforated, it shall be thoroughly sand pumped by the Contractor® DEVELOPING. TESTING AND CLEANING WELLS: Upon completion of sand pumping,, the Contractor shall install a turbine pump having a minimum capacity of 4*000 GFM and 200 feet total lift. Contractor shall pump and surge well as instructed by the Engineer* for a minimum period of 24 hours* or as much longer time as directed by the Engineer* until clean of sand* deeping a record of water pumped and drawdown. At the time of final flow test* the well shall not contain sand* gravel or other materials at locations where any of the perforations will be covered. \