Skip to main content

Search the Special Collections and Archives Portal

upr000187 59

Image

File
Download upr000187-059.tif (image/tiff; 26.25 MB)

Information

Digital ID

upr000187-059
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    2. Install booster pump and fir# protec­tion line around our reservoir, which is now without fire protection - »| g*|00. 5 , Brill one well to the fOO* horizon and install pump; Brill one well to the 600* horizon, and connect both wells to the settling basin — 52,600. Install booster pumping facilities in vicinity of the reservoir to increase pressure upon Hater Go.1# distribution system ---- - - - 6,500, A.fM, data is attached to Mr* Prater’s copy of this letter, We may have some difficulty In securing materials and pumping equipment, end it will take some appreciable time to drill the two wells. It appears certain that we will need this additional capacity by the time warm weather occurs, in view of which I recommend early approval. Franfc^SJrong CO - Mr. G..F. Ashby Mr, S. H. Prater — — 'Mr. W. H. Guild Mr. W. E, Bracken