Skip to main content

Search the Special Collections and Archives Portal

upr000139 42

Image

File
Download upr000139-042.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000139-042
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    \ On motion duly seconded, it was RESOLVED, that the action of Vice President Reinhardt in executing letter agreement "N"L.D. 2711, dated July 21}., 1953, with the Longley Construction C0., Inc., covering the construction and laying of approximately 130 LP of 6 ” cast iron water mains to serve property of L. T. Garrett on the west side of Bruce Street extending from Fremont Street to the first alley northerly thereof, Las Vegas, Nevada; consideration in the amount of $195-00; be, and the same is hereby, ratified, approved and confirmed. On motion duly seconded, it was RESOLVED, that the action of Vice President Reinhardt in executing Letter Agreement ”N HL.D. 2712, dated July 28, 1953, with the Longley Construction Co., Inc., covering the construction and laying of approximately 260 LP of 8" and 1287 LP of 6 ” cast iron water mains and 20 LP of 6" fire hydrant connections to serve Blocks 1 and 2 of Boulder Dam Homesite Addition #6, Las Vegas, Nevada, being developed by Madsen Construction Corporation and Draper H, Hand; consideration $1,961}.00, plus actual cost of premium on Surety Bond; be, and the same is hereby, ratified, approved and confirmed. On motion duly seconded, it was RESOLVED, that the action of Vice President Heinhardt and Secretary in executing Agreement "N^L.^. 2691}, dated July 30,1953, between LVL&WCo., called "Company”, and Lee Construction Company, Inc., -5~