Skip to main content

Search the Special Collections and Archives Portal

upr000043 60

Image

File
Download upr000043-060.tif (image/tiff; 26.25 MB)

Information

Digital ID

upr000043-060
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

JAN. 22, 1944 [As Amended! Corrected Copy U -l-d WAR PRODUCTION BOARD (Corrected Copy) Part 4500—Power, Water, Gas, and Central Steam Heat [Supplementary Utilities Order U-l-d, as Amended Jan. 22, 1944] § 4500.5 Supplementary Utilities Or­der U-l-d. In accordance with the pro­visions of paragraph (i) of Utilities Or­der U-l, extensions of electric, water, gas, and central steam heating, facilities may be made or connected by producers to serve premises, the construction or remodeling of which is authorized under Conservation Order L-41 by the issuance of a specific direction, order, certificate, or other authorization for construction, when all of the following conditions are satisfied: (a) Industrial or commercial con­sumers. The extension is designed to use the smallest sizes and quantities of equipment, conductor, and pipe required to furnish service at minimum standards. (b) Domestic consumers. (1) The extension, including any part built by or for the consumer, can be built within the limits established by the Housing Utilities Standards issued by the War Production Board. (2) In the case of gas or electric facil­ities primarily to serve cooking appli­ances, (i) the dwelling proposed for con-, nection is not equipped with a range of any kind; and (ii) complete facilities to a cooking range location are not in­stalled for serving either a gas range or an electric range, except that extensions to serve a gas or electric range which the consumer has used in a dwelling which he previously occupied may be made even though facilities for serving another type of range are already in­stalled. (c) All consumers. (1) The total cost of' material for each extension, exclusive of any part built by or for the consumer, does not exceed $1500, No job or project may be subdivided to come within these limits. (2) No other producer can render the i same service with lesser amounts of crit-y ical material. —?^ (3) The extension does not duplicate an adequate service already installed or constitute a standby 14) The producer 1 WPB-3348 for filing application under L- (d) Other orders. This order does not constitute a release, in the case of gas producers or consumers, from the re­strictions of Utilities Order U-7 or Limi­tation Order L-174. Issued this 22d day of January 1944. War Production Board, By J. Joseph Whelan, Recording Secretary. service. las completed Form""'\ with the builder’s J -41.. *GPO— War Board 9480— p. 1