Information
Digital ID
upr000287-184
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.wr»r»irci Water will be diverted 4^5. Description of propos«4 by a drilled well and distributed through a system of iron pipe lines. o 14. 15. Estimated Estimated cost of works__ $10, Q00«.----------- ------------------------ time required to construct the works is--- 2 years-------- LOS ANGELES & SALT TAKE RAILROAD Q0-.---- Applicant ?Ry SiGgenende ra(lC aAltvtionr Mn.e yGory) OF STATE ENGINEER