Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
2 - Description Lay 9060 lin. ft. of 24" cast iron water main from end of present 24n reservoir outlet to connection with existing 16" water line in shop grounds, and connect to distributing system. Investment Year $61 353.02 1929 1930 1931 1941 Amount $60 193.08 1 362.03 60.35 262,44 V.O. 684 *• Drill new 12n artesian well 802* deep, laid 1269.2* of 12" transits pipe from well to settling basin, 1062* of 24" pipe line from basin to reservoir and 3646* of 16" pipe line replacing 2826* of 16" and 820* of 24" redwood stave pipe line and constructed boiler tube fence 48' x 48* square around new well. 19 967.89 1936 19 415,89 1937 552.00 V.O. 1402 - Renewed 6038 feet of 16" water line, using cast iron pipe to replace wood stave pipe between reservoir and city connection and extended 1528.9 ft. to new city connection. 8 509,54 1939 8 214.71 1940 294.83 V.O. 1537 - Drill 2 additional wells, recondition one well and make improvements at Middle Spring consisting of retaining wall and cover pipe lines and cleaning out. 30 349.77 1940 30 458.95 1941 109.18 V.O. 1815 - Drill two wells approximately 500 feet deep including furnishings and well casings 32 702.97 1941 15 969.81 1942 13 653.66 ' 1943 3 079.50 V.O. 2013 - Drill two additional water wells, construct pipe lines and tank, install chlorinator and booster pumps and other facilities. 59 718.91 1942 54 766.16 1943 4 952.75 V.O. 2029 - Drill two additional water wells, construct pipe lines, install additional booster pumping facilities, raise wells of settling basin, and install pump on well No. 4. 79 620.11 1942 71 523.19 1943 8 096.92 Total Improvements Total Land Valuation GRAND TOTAL Valuation of facilities year ending December 31, 1944, based on valuation as of Dec,31,1943: Land $ 34,985.88 Improvements 405.858.51 Total $440,844,39 Interest ® 6$ on $440,844.39 Depreciation @ 4$ on $405,858.51 Insurance (Estimated) Taxes, $1.75 per $100.00 on $440,844.39 Maintenance and protection of wells, . reservoirs, pipe line, etc* during year 1943 $405 858.51 34 985.88 $440 844.39 $26 450,66 16 234.34 50.00 7 714.78 18 141B $66 591.30 L.V.L.& V.Co. proportion based on relative gallons of water used during year 1943: U.P.R.R.Co. - 432,926,368 gals. - 18.62$ L.V.L.& W.Co. - 1.891.646.500 gals. - 81i.38$ 2,324,572,868 gals. -100*00$ L.V.L.& W.Co. proportion year 1944 $ 54,192.00 Auditor of Disbursements' Office, . Omaha, Nebraska, April 5, 1944. ( D-386-4)