Skip to main content

Search the Special Collections and Archives Portal

upr000095 61

Image

File
Download upr000095-061.tif (image/tiff; 26.85 MB)

Information

Digital ID

upr000095-061
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 lie tie® in writing of its intention so t© do, shall have the right (a) to construct an adequate pipe line of a capacity equal to or exceeding that of the existing 24-inch cast iron pipe line and 16-inch transits and cast Iron pipe line shown on said Exhibit HA-1” by broken black and red lines and of a type and size to be mutually agreed upon; and in the event the parties cannot agree upon the character of said pro­posed pipe line within ninety (90) days after said Witten notice, the same shall be constructed by Union Pacific of 39-inch concrete or pipe of a similar character. Said proposed pipe line shall be constructed in the location shown in broken red and white line between points marked A and ? and V and X on said Exhibit "A-l*. (b) to construct a 24-inch pipe in the location shown in broken rod and white line between points marked K and S on Exhibit HA-1” and an 8-inch pipe line in location shown in broken red and white lines between points marked Y and D on Exhibit MA-1”, it being understood that unless the parties can agree on the type of said 24-inch and 8-inch pipe lines within ninety (90) days after such written notice, Union Pacific shall construct such pipe lines pursuant to good engineering practice and of the capacity herein­above mentioned in this subparagraph (b)j