Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
\ Work Order there was added to the plant of the Railroad Company, facilities having a recorded cost of $344,333*35, which are listed in detail as follows: Description Recorded Amount $54’ of 24" transite pipe 166’ of 18s* transite pipe 219’ of 14" transite pipe 944T of 12” transite pipe 16’ of 36” C.I. pipe (S.H.) 10,697* of 24” C.I. pipe 54* of 16” C. I. pipe 354* of 12” C. I. pipe (S.H,) 94’ of 8” C« I. pipe 36T of 6” C. I. pipe $19* of 4" C. I. pipe 37* of 12” W.I, pipe 7$’ of 2” W. I. pipe 100* of 6” V. C.'pipe 1 - Drilled well, 16” casing 1 - Concrete reservoir 1 - Concrete settling basin 1 - Pump house 1 - Set of anchor blocks 1 - Valve box 974* of Cyclone fencing Pumping equipment 15 - C.I. valve boxes 2 - Wood valve boxes 6 - Fire Hydrants Hose reels and nozzles Power line - poles Power line - wire, etc. $ 11:290.07 1,513.09 1,330.7$ 3,584.02 '369.55 153,933.86 '3$5.74 5,067.81 377.32 '305.51 I, 542.47 255.80 250.00 '426.34 16;396.17 97;571.47 9;197.77 12,356.19 -300.00 1,635.45 2;349.$$ 10,136.7$ 167.34 50.00 671.23 '380.45 1;421.92 II, 066.34 TOTAL - RECORDED COST $344,333.35 All of these costs were not recorded in the books of the Railroad Company during the year 1946, but $261,402.90 of such costs were recorded and would ha.ve been shown in detail in the evidence at the hearing in this case had there been any intimation on the part of the Commission or any other party that the Investment Cost figures introduced by the Railroad Company were -31-