Skip to main content

Search the Special Collections and Archives Portal

upr000067 209

Image

File
Download upr000067-209.tif (image/tiff; 33.75 MB)

Information

Digital ID

upr000067-209
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    V. ' * upon the total eost of the work performed by Union Pacific un­der this section 3* The right t© construct said new pipe lines referred to in this Section 3 shall include the right fee construct pumps, reives, connections end appurtenance** Section 4 * In the event the District and Union Pacif­ic are able to agree upon the type and nature of the pipelines and pumping stations t© he constructed by the Union Pacific pur­suant to the provisions of Section 3 hereof, said new pipelines, appurtenances and pumping station shall be constructed, and said pipe lines shown by broken black and red line on inhibit nk* shall be removed, under the Joint direction of the District and Union Pacific pursuant to a contract to be entered into between the Union Pacific and a contractor after bids have been obtained therefor* In the event the Union Pacific and District shall be unable to agree upon the type and nature of said new pipe lines and pumping station, Union Pacific shall nevertheless have the right to construct said facilities as provided in Section 3 and to remove said pipe lines shown by broken black and red lines on Exhibit *4* pursuant to a contract to be entered into between the Union Pacific and & contractor after bid© have been obtained therefor* In either event the contract price thereof plus 10$ for supervision shall be considered a© the cost to Union Pacif- .1c of constructing ©aid new pip® line facilities and pumping station and removing said existing pipe lines* Section 5. In the event the pumping station referred to in subparagraph (e ) of Sections 2 and 3 hereof shall be re­located as therein provided, Union Pacific agrees to grant to the District by separate instrument a parcel of land approxi­mately 5,000 square feet in area as a site for said relocated pumping station shown by green square near point S on Jhtbiblb ^A*, said great to be subject to reversion to the grantor,its 6 ,