Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
..? Mm ' A : 1 1 •pJ.\‘ Description of propose/d work, s. Water will be diverted by a drilled wel^. and distributed through a system of iron pipe lines. •c ,.m i 1 4 . E s t im a t e d c o s t of works $10,000 1 5 . E s t im a t e d time r e q u i r e d Compared AP-FR Map filed Aug. 5> 1953 to construct the works is— 2. y_paCrsompamy Los Angeles & Salt Lake Railroad/Applicant B s/ Calvin M. Cory___ ‘y ? General Attorney APPROVAL of state engineer This is to certify that I have examined the foregoing application, and do hereby grant the same, subject to the following limitations and conditions: This permit to change the point of diversion of the waters of an underground source as heretofore granted under Permit No. 7200 is issued subject to the terms and conditions imposed in said Permit No. 7200 and with the understanding that no other rights on the source^ be affected by the change proposed herein. A substantial head-cate and weir must be installed at or near the point of diversion to facilitate the measurement and control of water. The State reserves the right to regulate the use of the water under this proposed change at any and all times. The amount of water to be appropriated shall be limited to the amount which can be applied to beneficial use, and not to exceed 2.5______ cubic feet per second. Actual construction work shall begin on or before .December 8,— 195/L. Proof of commencement of work shall be filed on or before January 8, 1955 Work must be prosecuted with reasonable diligence and be completed on or before December 8, 1955 Proof of Completion of work shall be filed before_____ January 8,_195,6— Application of water to beneficial use shall be made on or before______ December 8, 1956 . Proof of the application of water to beneficial use must ‘be filed with State Engineer on or before January 8^ 1957---. v s