Skip to main content

Search the Special Collections and Archives Portal

upr000211 171

Image

File
Download upr000211-171.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000211-171
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    (() ws with respect to the tVLAw budget reoosmendatione • insofar as a polio e bit to water supply, please note* Item X. The change in Hr. Bracken*a recommendation was made with his concurrence and with a view of conforming with our recoaneendation lit the following item. All of these additional lines do not confer* with the Taylor and Taylor recommendation of September, 19W » hut hr. Bracken advises deviations therefro* art brought about by local changes which were not apparent at the tine the Taylor and Taylor reoowaendetien was nade. Its® 2 . This suggestion is nade to confer* with our Railroad reoositsendatlon for increasing the supply to 8,130,000 GBP. If thle increase beoones necessary the additional 10* line and distributing eye tea will be required. Conferring with Purchasing Pepartnent, we are advised it will require fro* ten to twelve weeks to secure east lrcn pipe. Therefore* if the budget recommendations are approved, the situa­tion should be watohed closely, and if need for additional vatar becomes apparent Isnedlata. steps should be token to prooure necessary authority and place purchase orders. Frank Strong C. F. Hauler CC - Mr. W. H. Guild Mr. F. 0. Paulsen Mr. 8 . H. JLaracn MT. W, H. Bracken