Skip to main content

Search the Special Collections and Archives Portal

upr000078 49

Image

File
Download upr000078-049.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000078-049
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Form 30-1 (Last Sheet) C. S. 6-30-100,000----U WORK ORDER AUTHORITY—Detail of Estimated Expenditures f_OF___JJsHEETS LAS VEGAS LAND A gagi Bearing .DEPARTMENT .DIVISION October 11 * .19. LOCATION: DESCRIPTION Laa Vegas, Nevada Relay approximately 2588s Of 4" wood a teve water p . with 4" and e* 6 .X .pipe line and lay 50s of 1" and 405° of/ noN: 3/4« a#x,pipe eervice lines in fardle Addition; relay 253^ nd and C.I.pipe line trenew (i 1 5???^ xnxS \ General Manager’s 241 revaluation Section of 4“ and 6" wood stave pipe line with 4" aad 6" Cl. pip# linetrenew ' [ Department 54® of 1* and 278° of 3/4" G.Icpipe service lines and install 2 additional « boar in Hawkins Addition. Install 114° of 4" C.Xo pipe line, eto> for La3 y< No.- No.- R.and E.' ACCT. No. ? DESCRIPTION Hawkins Additlen BAishiiag0 lay pipe and has kf ill Losating pipe linos,truek+ ing and supervision 1" galv •wrot steel pip# velvet and fittings-rene 3/4” galv owrot steel pipe valves and fittings-rsns Arbitrary percentages QUANTITY ired ired UNIT Left AC CPUS 3 i ECOLLEC IBLS-LA^I m Bitching* lay pipe and backfill lid Locating pipe lines„truck ing and supervision 4” presaulksd 0X150 ClP 114 4M C.Iofittings A Special! 3N galv ? wrot eteel pipe and fiitings Lead aud oakum Arbitrary pereentages Notes- At the tine water lines la Ob Addition were acquired tie woodes liner were considered worthless add would require replacement 9 therefo the outire coat ef replacement is chargeable to Investment Ac countv Loft TOTAL UNIT COST pipe d re n 0.55 0o5$ 0.52 LABOR MATERIAL OR TRANSPORTATION CHARGES 580 63 4 >8 7 10 TOTAL CHARGEABLE TO INVESTMENT ACCOUNT 4 40T 4 730 Total Estimated Expenditure Estimate By_ Date— .19- Approved. - - $_ -Approved- 8 125 OPERATING EXPENSES 1 831 City of Las Vegas 290 n 3ior *W h e n labor or m a terial is chargeable to both Investment A ccount and Operating Expenses show items separately.