Skip to main content

Search the Special Collections and Archives Portal

upr000206 43

Image

File
Download upr000206-043.tif (image/tiff; 26.25 MB)

Information

Digital ID

upr000206-043
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    March. 30, 1925. ¥.0. 4707 Mr. ¥, M. Barr, Consulting Chemist, Omaha, Hebraska. Dear S ir: As requested in your B-951 of March 23rd, I enclose herewith detailed estimate, together with drawing Ho. S-235J also print showing entire pipe lin e and work pro* posed in connection with Las Vegas water supply, as contem­plated "by 1925 Budget Item Ho. 98. The work proposed by 1925 Budget Item 98 in­volves a portion of the work under existing AFB Request Ho. 228 approved September 18, 1923, in that Mr. Mann now rec­ommends that we modify present authority to Include only new well and fence around Big Spring, replacing buildings, 300* of 8" and 2400 * of v it r ifie d pipe from springs, also concrete forebay. This w ill enable proceeding with work contemplated by Budget Item 98, on basis of in sta llin g concrete settlin g basin with 40’ of 20M wood stave pipe and Excelsior f i l t e r in water softener, also replacing 1460’ of 12" and 370V of 16tt VC pipe encased in concrete with the 1816* of 24” wood stave pipe, as it is very desirable to have a larger pipe at upper end to reduce losses in pressure from fric tio n . It is also desired to renew 1808’ of present 16" VC pipe at lower end, which is encased in concrete, with 16H wood stave pipe before pressure is increased by in s t a lla ­tion of 24* pipe, as this VC pipe is constantly giving trouble. The 16" wood stave pipe authorized has been purchased but delivery deferred due to d e s ira b ility of providing larger pipe fo r f i r s t section of the lin e. The total estimated cost i f handled on basis out­lined w ill be $22,170,, of which $10,175 w ill be chargeable to Capital Account and $11,995 to Operating Expenses, as against an , estimate of $11,840 provided in 1925 Budget Item 98. C . G . I - MAR 301925 3 — A A a Yours very truly, r T KNICKERBO CKER