Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
More Info
Rights
Digital Provenance
Publisher
Transcription
LOS ANGELES AND SALT LAKE RAILROAD COMPANY Sheet 5 Property embraced in Contract Audit No. 71+531 L.A., with the Las Vegas Land and Water Company A - Additions Description • B - Betterments Original cost to date of property j in place as of December 31, 1950 : •• : Investment : Date : W.O.No. : Size : Kind : Unit : Cost : No. of : Units : Recorded : Amounts : Estimated amounts : Total : :Unit. Price : Total : Original Cost : Miscrl. Concrete Items "1 | i ! % i' 1911 1053 Forebay Each 1 800.56 A 800.56 1927 7392 Valve box If 1 203.7)4 A 203.71+ 1927 7393 Manhole and forebay IT 1 156.i+2 A 156.1+2 1929 82)48 Pedestals over creek If 12 1+63.18 A 1+63-18 1929 821+8 Valve boxes If 5 315.56 A 315.56 1929 8577 Pedestals If 13 213.66 A 213.66 1929 8577 Valve boxes If 6 1+79.05 A 1+79.05 1939 11+02 Valve and meter boxes If 2 203.1+0 A 203.1+0 19)42 2029 Valve box ff 1 307.03 A 307.03 19U6 3180 Anchor blocks Lot 1 300.00 A 300.00 Valve box Each 1 1,635.1+5 A 1,635.1+5 Total 1+1+ 5,078.05 5,078.05 Frame Structures 1926 6871 Ventilator on shelter Each 1 125.1+1+ A 125.1+1+ 19I4I 1537 Spring house II . 1 2,026.29 A 2,026.29 19u2 2013 Floor in pump house ff 1 508.51 A 508.51 191+2 2029 Pump house It 1 1 ,779.57 A 1,779-. 57 Total 1+ 1+, 1+39.81 1+, 1+39.81 1910 Fencing 1053 Wire Lot 1 I+67.OO A 1+67.00 1925 '5589 f! Lin.Ft. 300 51+1.59 A 51+1.59 1929 821+8 n ft 913 1,657.91+ A 1,657.91+ 1936 681+ it tr 178 295.57 A 295.57 19)46 3180 Cyclone chain tf 971+ 2,31+9.88 A 2,31+9.88 19U9 1+261 ft If ft 151 777.06 A 777.06 Total 6,089.01+ 6,089.01+ Water Tank 19)42 2013 8000 gal. Wood on cone. rdn. Each 1 510.65 A 510.65 Pumping Equipment 1 9 U 1537 Mechanical" equipment” Lot 1 1+77.70 A 1+77.70 19142 1815 Deep well pump Each 2 6,027.92 A 6,027.92 191+2 2013 Pumping equipment Lot 1 11,261+. 73 A 11,261+. 73 191+2 2029 u it ft 1 6,251.89 A 6,251.89 191+6 3180 11 11 ft 1 10,136.78 A 10,136.78 101+9 i+261 11 11 ft 1 12,23l+.35 A 12,23l+.35 Total 1+6,393.37 1+6,393.37 800.56 203. l h 156.1+2 1+63.18 315.56 213.66 ii79.05 203. 1+0 307.03 3 0 0 .0 0 1,635-1+5 5,078.05 125.1+1+ 2,026.29 508.51 1,779.57 1+,139.81 I467.00 51+1.59 1,657.9U 295.57 2,3)49.88 777.06 6,089.Pit 510.65 14147.70 6,027.92 H,26U.73 6,251.89 10,136.78 12,23)4.35 146,393.37