Skip to main content

Search the Special Collections and Archives Portal

man000161 91

Image

File
Download man000161-091.tif (image/tiff; 36.05 MB)

Information

Digital ID

man000161-091
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

fc; 1 i * ** % specified in paragraph 1 of Article I hereof and the furnish­ing of such necessary easements, to order the necessary pipe, fittings and other materials and upon the arrival of pipe and materials aforesaid at Las Vegas, to proceed with the installation of said water main along the lines so staked upon the ground by the Subdivider, and to complete the said installation with reasonable diligence. Said water main shall consist of six inch Cast Iron pipe. 2. To pay to the Subdivider at monthly intervals, fifty percent (50$) of the monthly revenue received by it from customers in said Blockx 25 xxx _____ of said respective Subdivisions, taking water from the water main so installed hereunder, for a period of ten (10) years from the date of the completion of said Installation, or,until the Subdivider V " 7 has been repaid the actual cost of the line so advanced by it, whichever occurs first. It is mutually agreed: 1. That the water mains so installed shall be and remain the property of the Company. 2. Should the actual cost of the Installation of said ARTICLE III water mains exceed the estimated cost of S 2 >325»QQ__________ then and in that event the Subdivider will pay the excess to the Company, upon demand, if said actual cost be less than $,..2,325-00- , then the Company will pay to the Sub- A-14-