Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.81. (c) Immediate relief of the seasonal water shortage cannot be achieved because of the greater initial construction period. Neither Method 2 or Method 3 has any appreciable inherent advantages over the other. The selection can be made entirely on the basis of costs. Since the combination pipe line (Method 3) is less expensive both in first cost andin the 30-year cost, the work contemplated by Method 3 is preferable . It 1s to be noted that in computing the 30-year cost under the combined pipe line, the following construction schedule was assumed: First Increment - Construct in 1950; 20-lnch pipe from BMI to Junction; booster station with 1-10.0 MOD at 247* pump; 42-inch pipe line from Junction to Las Vegas; provisions made for future line booster, Junction storage, and fully equipping junction booster station (No. 3). Second Increment - Construct in 1958; Intake on Lake Mead; Intake storage, 40-inch pipe line from Intake storage to Junction; completion of all booster stations. The total project contemplated herein, and the approximate dates of construction are as follows: