Skip to main content

Search the Special Collections and Archives Portal

upr000217 37

Image

File
Download upr000217-037.tif (image/tiff; 23.4 MB)

Information

Digital ID

upr000217-037
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Los Angeles - July 11, 19 4 5 Mr. B, H. Prater: Referring to your telegram A-9 0 of June l4th re: order­ing materials for Las Vegas water facilities: Attached are the following: 1. Copy of our Reqn. 64-114, Sheets 1 to 10, inclu­sive, dated July 6, 19^5# listing materials required in construction of the revised project, which we propose to purchase under existing WPB Authority, Serial No. 10-1-9993, dated April 11, 19 4 5 . 2. List of pumps, motors and orltioal materials for which additional WPB Authority is required exclusive of reservoir, eleotrloal facilities and pole line. We have not included in the attaohed statement the 10 ,5 6 6 feet of 24“ C.I. pipe recently purchased, as General Purchasing Agent verbally advised that as we had purchased this material it would be unnecessary to include in the new application. As per telephone conversation date, it is under­stood that you will rough out a bill of material for the lumber and hardware far the reservoir (we understand priority not required for reinforoing steel) and will include in the WPB application, and that owing to pres­sure of work in your office we will arrange for design of the 1 ,500,000-gallon reservoir at this end. Further, as per recent conversation, you will add necessary materials far eleotrloal and pole line facilities. 3 . One set photostat prints of our work sheets list­ing various items of equipment, pipe fittings, eto., weight and estimated cost thereof, required exclusive of reservoir, electrical facilities and pole line. 4. Print of preliminary layout plan of proposed pump house and piping layout in vicinity of reservoir. We have inoluded in the attaohed list of materials one 6-ft. length of 36" O.I.P. outlet in wall of reservoir and a 36* to 24" C.I. Reducer.