Skip to main content

Search the Special Collections and Archives Portal

upr000097 11

Image

File
Download upr000097-011.tif (image/tiff; 27.15 MB)

Information

Digital ID

upr000097-011
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    INSURANCE: Insurance shall be carried by the Contractor In accordance with the Form of Contract attached. PERMITS: The Contractor, at his own expense, shall pay for permits if required. REJECTION OF BIDS: The Las Vegas Land and Water Company reserves the right to reject any and all bids as it may deem advisable. COMPLETION OF WORK: The completion of the work is important, and the same must be organized, promoted and prosecuted as required by the Las Vegas Land and Water Company, and the Contractor, when submitting his bid, shall specify the time required to complete the work. BIDS: Bids shall be made by filling in the form of Proposal and Bid, attached in duplicate, and delivering the original of the same in a sealed envelope under personal cover, addressed to Mr. L. R. Maag, Acting General Manager, Las Vegas Land and Water Company, 401 South Second Street, Las Vegas, Nevada, on or before the above specified date. It is important that all information requested in the Proposal and Bid form shall be furnished by the Contractor. All plans must be returned with the Contractor's bid. I Page 3