Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
w 26 co: March ty, 1954 Mr. E. E. Bennett - Los Angeles Mr. Wm. Reinhardt Mr. G. M. Cory Mr. W. A. Jurden to Shop Well, in which he requests that I advise you the estimated time when it may be possible to use water from the new point of diversion. question as to when he expects the work on the new elevated steel tank will be started and the estimated date when the water tank will be completed and ready for operation. Mr. Jurden advises that the tank contractor will start work of erection on March 15th and that the contractor's estimated time for completion is 75 calendar days, which will bring the completion date up to June 1st. After discussion, it was agreed that if everything goes along without any trouble and without complications, it might be possible to complete the tank by June 1st, but it is my opinion, in which Mr. Jurden concurs> that based on past experience with work of this nature the estimated completion date of June 1st is entirely too optimistic, in fact, I would think that a completion date as of July 1st would even be somewhat optimistic, and it is my own guess that August 1st would be more like the date when tank can be put in operation,, My opinion is based on the knowledge that unforeseen difficulties are always, encountered in work of this nature since, in addition to the erection of the steel work for the tank, it will probably require at leaat two coats of paint, which will probably require a period of at least two weeks, and it will also be necessary to fill the tank with water for a test as well as to fill the tank at least three times after painting in order to chlorinate the tank and .secure a sample cf water for analysis by Health Department. If the Health Department analysis does not show a clear sample, it will, of course, be necessary to rechlorinate it as many times as is required to procure a satisfactory sample. After all this is done, tank will then be ready for operation. from the new point of diversion in the shop grounds, it is my opinion that when the Shop Well is put in condition for operation and all of the connecting lines to facilities of the Railroad Company are constructed, the Shop Well could be used for service to the facilities of the Railroad Company at that time, but it is my opinion, in which Mr. Jurden concurs, that it would not be good practice to depend on the Shop Well entirely for water service to Railroad facilities without the availability of an additional source from the mains of the Water Company as it could conceivably develop that at peak demand the Shop Well would not furnish sufficient water independent of a tank supply. This would be especially true if it became necessary at any time to start a fire pump for fire-fighting purposes or in case of well failure. It would therefore seem that, if the present Shop Well is considered the new point of diversion, it could be used as soon as placed in working order and pipe lines constructed, on the assumption that water from the existing Water Company main would be available to supplement the well production at any time and as often as required during operation under these conditions. Today I discussed with Mr. Jurden, Division Engineer, the With regard to the question as to when water can be used