Information
Digital ID
upr000280-125
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.J\Work Order Page No.___ 2. Number Description of Project Amount Total 4261 1 - Pump house 1 269.79 151 ft Fencing 777.06 1 - Pumping equipment 12 234.35 Poles and poxrer lines ? 1 794.07 976 ft - 14" Transite pipe 5 396.36 681 ft - 12” Cast iron pipe 5 273.56 10 669.92 27 745.19 4500 1534 ft - 12” Transite pipe 7 644.45 7 644.45 4712 5 ft - 12" Cast iron pipe 1 067,36 (Including valves and fittings) 36 ft - 8" Cast iron pipe 1 008.44 2 075.80 2 075.80 (Including valves and fittings) 4728 1 - Pump house 1 275.39 3 - Pumping equipment 11 597.52 Power lines 5 779.15 18 652.06 4789 2364 ft - 14” Transite pipe 13 827.03 45 ft - 14" Steel pipe 742.91 14 569,94 I36 ft - Fencing 665.02 1 - Pumping equipment 16 767.76 900 sq. ft - Roadway graveled 843.96 Power lines 1 450.42 34 297.10 TOTAL 531 5-46.22