Information
Digital ID
upr000092-078
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.m The right to construct said pipe line shall include the right to construct pumps, valves, connections and appurtenances. timated cost of said pipe lines hereinabove in this section referred to, including all appurtenances and pumping stations, is $300,000.00, this sum being an estimated cost, the actual a mount of said final cost to be determined upon the completion of said pipe line facilities and pumping station. Section ”Ci “ as hereinabove in Section 2 re ferred to shall include 1 ictual cost of construction of It is mutually understood and agreed that the es-said pipe lines plus the/ following items: 4