Skip to main content

Search the Special Collections and Archives Portal

upr000188 162

Image

File
Download upr000188-162.tif (image/tiff; 23.24 MB)

Information

Digital ID

upr000188-162
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    O F F IC E OF EXECUTIVE a ssist a n t JAN 24 1942 LOS ANGELES, CALIF. Las Vegas - January 23, 1942 W 23-1-18 Mr. Frank strong, fist President, LVLdW Co., Los Angeles, California* Star sir: Referring to ay letter January 17th, to Mr. McH&mee, regarding contract with Tiffany Construct­ion Company, covering installation of water mains in the Biltssre Addition. 1 enclose herewith, for execution, original and duplicate original of proposed contract, which has hash executed by floe president and attested by secretary of iiltaorc Homes Incorporated, approved as to fora by Mr. Bennett. My letter January 7th, indicates estimated cost of this installation is $8810. In ordtr to afford a slight margin for eeatingenelee, X suggest the figure $9,000 bo inserted in the blank space on Page 2 and again on Page 8 I it is understood that the Job will bo put in at actual cost. However, if this is not entirely agreeable, the figure of $@810 may be used in lieu thereof. the blank space on Page 3 should be filled in to indicate 4040 foot. f# have not yet submitted a copy of this contract tc the Public Service commission for its approval, as required in Article 2, Page 3, but will do so upon advice from you as to the contrast being agreeable*