Skip to main content

Search the Special Collections and Archives Portal

upr000036 239

Image

File
Download upr000036-239.tif (image/tiff; 26.82 MB)

Information

Digital ID

upr000036-239
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    N R2TIM m mm M. MONTQOMERT Consulting Engineer Bear Mr. laxfield: , accordance with your Instructions 1 hare reviewed the plan developed fey Mr. Ralph ©*Kelli* Consul ting Engineer, for supplying supplemental water to the has Togas Talley Water District fro® the water supply facilities of B.M.I. My study of Mr. ©?Kelli’s plan |§8 ei^lified fey reason of ay past association with the project. The original B« M.I. water supply system was designed and tins const­ruction supervised fey the engineering fir® which 1 then headed as general manager and chief engineer. My review of the proposed plan Included a study of Mr 0*11 sill’s tQ wm and the accompanying drawing as well as interviews with hi® personally. An examination was made of the hydraulic characteristics of the system proposed fey Sr. O’Heill. ?,?y findings are in close agreement with his. & Mp* O*Neill's plan is sound fro® as engineering standpoint. In­creasing the capacity of the intake pumping station could fee acc­omplished in any one of several ways, the pipe line to the Manganese Ores plant has adequate capacity *»d, even at full flow of §0 all lion gallons per day, the velocity would not fee excessive. The booster pumping station could fee utilised without change and. as stated fey Mr * 01 Neill, with little or no loss of efficiency, other features of the plan are In accordance with well established practice. It is sy opinion that the plan worked out fey Mr, 0’Kelli fully answers the requirements of the Federal Government and the Water District, as 2 understand them, and that it represents an extremely economical solution to the problem. J MWLt-Bm Tours Very truly, I signed) James M. Montgomery.