Information
Digital ID
upr000204-067
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.November 19# 1953 1”733^ ka R MEMO: % Nov 2^ 195 Mr. Reinhardt: Referring to your letter to Mr. Hanson November 12, 1953# relative to proposed construction of new water tank at Las Vegas incident to transferring water appropriation from water field to shop well* In conversation with Division Engineer^ office today I was informed that the awarding of contract for erection of this tank is being handled by Mr. ¥. C. Perkins with a firm in Kansas City. Some time ago Mr. Perkins had Division Engineer make some soil tests at site where tank is to be erected. Data was furnished to Mr. Perkins so foundation for tank could be designed. Division Engineer has not yet been furnished data and prints so foundation can be constructed by Division forces nor does Division have any information as to award of contract for tank erection which would indicate when construction is to be started or completed. In the meantime, water service forces are laying pipe lines and doing what they can under the work order, and state this part of the work will be completed by the time the tank is erected. L. C. Conner