Information
Digital ID
upr000094-001
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Form 2191-B ,1 1-43 -1 M M Time Filed. UNION PACIFIC RAILROAD COMPANY TELEGRAM LOS ANGELES 5/8/53 RMS - OMAHA YOUR LETTER MAY 7, 1953 ENCLOSING SIX COPIES OF STATEMENTS ALLOCATING COST OF ADDITIONS AND BETTERMENTS MADE TO WATER SYSTEM LAS VEGAS PRIOR AND SUBSEQUENT TO SEPTEMBER 1, 1952. RLA HAS PREPARED MAPS TO ATTACH TO PROPOSED PURCHASE CONTRACT SHOWING PROJECTS COMMENCED PRIOR AND SUBSEQUENT TO SEPTEMBER 1, 1952, WHICH ARE NOT ENTIRELY CONSISTENT WITH YOUR STATEMENTS. HIS FILES INDICATE THAT LVL&W WORK ORDER 699 WAS COMMENCED PRIOR TO SEPTEMBER 1, 1952, AS PER WHJ LETTER TO L V PEART JANUARY 5, 1953 SAYING WORK WAS COMMENCED AUGUST 18, 1952. HIS RECORDS ALSO SHOW THAT WORK ORDER 709 WAS AUTHORIZED 12/2/52 AND HE ASSUMES SOME WORK DONE UNDER THIS PRIOR TO MARCH 31, 1953. PLEASE ADVISE BY WIRE TODAY SO THAT MAPS CAN BE CORRECTED IF INFORMATION FURNISHED BY RLA IS INCORRECT. B-51 E E B