Skip to main content

Search the Special Collections and Archives Portal

upr000267 128

Image

File
Download upr000267-128.tif (image/tiff; 32.65 MB)

Information

Digital ID

upr000267-128
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    INTAKE STRUCTURES ON LAKE MEAD - SOUTH SHORE TABLE NO. 15 TO B E CONSTRUCTED IN GREELEY A N D HANSEN E S T I M A T E I ^ b 195*5 TOTAL “ I ¥ 5 5 1 1 5 1 . ---- TOTAL---- Cantilever Structure 25©1 long $ 3*10,000 $ 3**o,oo© $ 3**0»G00 $ 3**o,ooo Pumping Equipment - **-300 H.P. Units 1© MOD 136* TDH ® $17,530.00 Valves, checks, etc., lnol. installation Valves, piping, etc., on structure 7©,©00 19.000 25.000 70.000 19.000 25.000 39.000 25.000 39.000 25.000 Intake Pipe Line 1900 ft. - 5**-« x 5/16» steel line ® $5©.©© ft. 95,000 95,000 92,000 92,000 Controls, etc. 25,000 25,00© 25,000 25,000 ECnognitinnegeernicnige s- Plans - Inspection, etc. - 57^,000 86,000 50,000 57**,000 36.000 50.000 - 571,000 33.000 50.000 571,000 33.000 50.000 TOTAL TABLE 15 - $ 710,000 $ 710,000 - $ 709,000 $ 709,000 ESTIMATED COST OP CONSTRUCTION - EXCLUDING POWER TRANSMISSION LINES AND STATION EQUIPMENT $3,1*U,000 $**-,001,000 $7,1*1-2,000 POWER TRANSMISSION LINES AND STATION EQUIPMENT i**3 ,ooo 223,000 371,000 • TOTAL ESTIMATED COST OP PROJECT $3 ,2S9 ,®0© $**-,22**-,000 $7,513,000 $3,122,000 $**-,239,000 $7,*m,ooo (*) NOTE: This east evidently included In G-reeley a n d H a n s e n ' s estimate of eost of Boos t e r Stations. I