Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
1 Bonanza Road near point marked U on Exhibit "A"* 2 (f) The construction of a 6-inch cast iron pipe line 3 shown by solid red line between points marked J and 00 on Exhibit 4 "A”, if said pipe line shall not have already been constructed. 5 (g) The construction of a three phase power line connee- 6 ting with the facilities of the SOUTHERN NEVADA POWER COMPANY so as 7 to provide power for the operation of the water production facili- 8 ties upon the lands shown tinted in pink on Exhibit "A” in location 9 shown by broken red and white line between points D and Y and Y and 10 V on said Exhibit MAn, H (h) The removal of that certain pipe line shown in broken 12 black and white line between points KK and LL on said Exhibit MA". 13 (i) The removal of that certain pipe line shown in broken 14 black and white line between points II and JJ on said Exhibit "A". 15 (j) The removal of those certain three-wire power lines 16 shown in broken black and green line between points AA and BB and 1 7 between points PP and HH on said Exhibit "A”. 18 (k) The removal of those certain six-wire power lines, 19 two-wire telephone circuits and two telemeter wires shown in broken 20 black and green lines between points CC and GG on said Exhibit "A". 21 (1) The removal of that certain cast iron pipe line shown 22 by broken red and black line between points marked A and E on 23 Exhibit MA”, that certain cast iron and transits pipe line shown 24 by broken red and black line between points marked A and K on Exhibit 25 "A”, and that certain pipe line shown by broken red and black line 26 between points marked R and HH on Exhibit HA". 27 28 25.