Skip to main content

Search the Special Collections and Archives Portal

upr000095 85

Image

File
Download upr000095-085.tif (image/tiff; 32.85 MB)

Information

Digital ID

upr000095-085
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

the surface of the lands to the condition existing prior to such removal. (c) Remove the pumping station now located at point HH. The District shall have the right to re­locate said pumping station in a new location shown in solid green square on Exhibit "A-l" near point R. Section 3» In the event the District shall not have commenced to construct the new pipe lines and removed the said existing pipe lines and pumping station as provided in Section 2 hereof within two years from the sale date and shall not have com­pleted said work within two (2) years and ten (10) months subse­quent to the sale date, Union Pacific, after having given the Dis­trict sixty (60) days' notice in writing of its intention so to do, shall have the right (a) to construct an adequate pipe line of a capacity equal to or exceeding that of the existing 24-inch cast iron pipe line and 16-inch transite and cast iron pipe line shown on said Exhibit "A-l" by broken black and red lines and of a type and size to be mutually agreed upon; and in the event the parties cannot agree upon the character of said pro­posed pipe line within ninety (90) days after said written notice, the same shall be constructed by Union Pacific of 39-inch cast iron or pipe of a similar character. Said proposed pipe line shall be constructed in the location shown in broken red and white line between points marked A and ¥ and V and K on said Exhibit "A-l". m to construct a 24-inch pipe in the location shown in broken red and white line between points marked K and E on Exhibit "A-l” and an 8-inch pipe line in location shown in broken red and white lines between points marked Y and D on Exhibit "A-l”, it