Skip to main content

Search the Special Collections and Archives Portal

Report of flood control work in southern Nevada winter of 1933 & 1934 by Civilian Conservation Corps, 1934

File

Information

Date

1934

Description

Report with photos that details flood control work completed by the Civilian Conservation Corps in Southern Nevada during the winter of 1933-34.

Digital ID

hln000587

Physical Identifier

Box 4 Folder 47 Flood Control Reports and Maps for Southern Nevada 1934-1950
    Details

    Citation

    hln000587. John Wittwer Collection on Agriculture in Nevada, 1898-1972. MS-00181. Special Collections and Archives, University Libraries, University of Nevada, Las Vegas. Las Vegas, Nevada. http://n2t.net/ark:/62930/d1p55hg43

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at?special.collections@unlv.edu.

    Standardized Rights Statement

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Digital Processing Note

    Manual transcription

    Language

    English

    Format

    image/tiff

    Supervision, Nevada State of Nevada Flood Control Work REPORT OF FLOOD CONTROL WORK IN SOUTHERN NEVADA WINTER OF 1933 & 1934 BY CIVILIAN CONSERVATION CORPS About the first of October, 1933 it was announced by Robert Fechner, in charge of the President's Emergency Conservation work, that erosion and flood control projects would be included within the CCC program. At the request of Cecil W. Creel, acting for the Governor, two CCC Camps, PE-202 at Moapa, Nevada with A. L. Ferguson of Ely, Nevada as Camp Superintendent and PE-203 at Alamo, Nevada with James Griswold of Elko, Nevada as Camp Superintendent, were approved about October 15, 1933 for the State of Nevada for the purpose of doing erosion and flood control work. Mr. W. E. Tangren, Assistant Forest Supervisor of the Humbolt National Forest, supervised and correlated the efforts of the Camp Superintendents. There was little time for preliminary investigation and extensive surveys but so time was lost in collecting information numerous suggested projects. The engineering committee, consisting of George W. Malone, State Engineer of the state of Nevada, Mr. L. M. Winsor, flood control expert of the Bureau of Agricultural engineering and Mr. J. P. Martin, Regional Engineer of the Forest service, were appointed by Mr. R. M. Rutledge,Regional Forester, for the purpose of rendering assistance in connection with engineering practice and to approve each project before construction was commenced. Tentative selections of projects were made by Mr. J. H. Wittwer, Extension Agent of Las Vegas, L. M. Winsor, W. E. Tangren and myself, in cooperation with Iocal people. The engineering committee made a field trip into Southern Nevada, for the purpose of Making final selection of projects and establishing standards. Mr. C. L. Forsling, in charge of the Intermountain Forest and Range experiment station, assisted in some of the preliminary work. The people of Pahranagat Valley and Moapa Valley, at the beginning, were not very enthusiastic about the flood control work. there were numerous rights-of-way problems and consequently the problem! of converting the people to the necessity and importance of the work and to gain their confidence in connection with standards was one of the first big problems.