Skip to main content

Search the Special Collections and Archives Portal

upr000098 23

Image

File
Download upr000098-023.tif (image/tiff; 27.32 MB)

Information

Digital ID

upr000098-023
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 No, 1 to said existing shop well or said new wells t© be drilled within the boundaries of said shop grounds. The District shall not protest or contest such application or applications. The term "shop grounds” as used herein shall mean those lands bounded on the west by a line parallel to and 1600 feet westerly of the westerly line of Main Street, on the east by the westerly line of said Main Street# on the north by Bonanza Bead, and on the south by Charleston Boulevard in the City of Las Vegas# Nevada. U 7 Notwithstanding Sections % and I hereof, if the Rail­road Companies shall not on or prior to the sale date have been authorized by the state Engineer to change the point of diversion of the entire quantity of 2.5 cubic feet of water per second authorized to be appropriated by the said Certificate of Appropria­tion referred to in this Section 2 from the existing point of diversion in Well No. 1 to a new point or points of diversion at said existing shop well or new wells to be drilled within said shop grounds# the lands referred to in paragraph (a) of Section 1 hereof shall be conveyed to the District subject to said Certificate of Appropriation to the extent of that portion of said 2.5 cubic feet of water per second for which the State Engineer shall not have authorized a change in the point of diversion. Within two years subsequent to the sale date the lailroad Companies shall have the right to obtain from the State Engineer authority to change the point of diversion for the entire quantity of water authorized to be appropriated In said Certificate of Appropriation from said Well No. 1 to said existing i i i I