Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
Los Angelas, Hay ST, 1954 l?4-g Hr* Calvin M. Cory* (ce - Mr* A* D. Hanson Mr. V* W* Smith Mr. K. A* Jurden Mr* L. R* Maag) Please refer to our previous correspondence concerning application which you filed with the State Engineer of Nevada on behalf of the Los Angeles & Salt Lake Railroad Company to transfer the point of diversion of i*§ c*f*s. of water now appropriated from Well Ho. 1 in the water field at Las Vegas. The new point of diversion covered by your application is the existing well of the Railroad Company in the shop grounds* 1 am advised that Boscoe Moss Company has made an attractive hid upon a second railroad stand-by well in the shop grounds by reason of the fact that that company’s equipment is already at Las Vegas drilling two wells for the LVL&V?Company. I presume this aid will hold good only if the driller a m promptly commence drilling of the new railroad well upon the completion of the two wells for the water Company* Accordingly 1 believe you should progress as quickly as possible the transfer of the present appropriation of 2*3 c*f*s* of water from Well Ho. 1 in the water field to the existing well and the additional stand-by well which will be drilled in the shop grounds. 1 see no reason for holding up the actual transfer of the appropriation to the new wells as soon as the State Engineer is in position to authorise the transfer* 1 am asking Mr* Hanson, to whom a copy of this letter is going, to advise us promptly when the contract is awarded to Boscoe Moss for the new well. I am asking Mr. Jurden, to whom a copy of this letter is going, to promptly furnish you a legal description of the location of the new well and a statement of what portion of the present appropriation of 2*5 c*f*s. of water should be transferred to the existing shop well and the portion which should be transferred to the new well.