Skip to main content

Search the Special Collections and Archives Portal

upr000093 48

Image

File
Download upr000093-048.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000093-048
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 The escrow Instructions referred to in Section 7 shall provide for disbursements by the Escrow Agent from said Relocation Fund pur­suant to the provisions of this Section 5. It is agreed that if payments are made from said Relo­cation Fund for materials supplied or work performed pursuant to a contract or contracts entered into by the First Parties* said First Parties shall be entitled to receive the payments from said Relocation Fund for services rendered by the First Parties as follows: (1) If it shall be necessary for the First Parties both to prepare plans and specifications for theperformanee of any contract or contracts by entered into/said First Parties and to inspect the work called for by said contract or contracts dur­ing construction, said First Parties shall be entitled to a sum equal to 10$ of the payments made pursuant to said contract or contracts, said sum to represent compensation for preparation of the plans and specifications and inspection of the work during construction, including any surveying and engineering necessary therefor. (2) If the First Parties shall use plans and specifications prepared by the District and approved by the First Parties, said First Parties shall be entitled to a sum equal to 5$ of the payments made pursuant to said contract or contracts, said sum 28b