Skip to main content

Search the Special Collections and Archives Portal

upr000068 142

Image

File
Download upr000068-142.tif (image/tiff; 26.45 MB)

Information

Digital ID

upr000068-142
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    % PROPOSED EXPENDITURES FROM $8,700,000 BOND ISSUE .. News Announcement Release - Item N o. 2 (Compiled by James M. Montgomery, District Consulting Engineer) 1. 30-MI 11 Ion gallon reservoir In West Las Vegas ............................................... $ 710,000 2. I^-Mllllon gallon reservoir at Manganese Ores.......................................... 85,000 3. Control building at Manganese Ores.......................................................... 53,500 4. Booster pumping station on U. S. Highway 95................................................... 197,000 5. Pipeline from Manganese Ores to 30-Mil lion gallon reservoir................... 1,661,500 6. Pipeline from Fremont Street to 30-Milllon gallon reservoir via Charleston Boulevard...................................................................................................... 292,000 7. Miscellaneous improvements to production facilities....................................... 133,000 8. New water wells................. 68,000 9. Improvements to increase capacity of 40-inch pipeline from Lake Mead to Henderson................................................................................ 620,000 10. Miscellaneous additional transmission pipelines................................................ 555,000 11. Miscellaneous additional improvements to distribution system................... 632,000 12. TOTAL ESTIMATED CONSTRUCTION COST...................................................... $5,007,000 13. Contingencies....................................................................................................... 262,000 14. Purchase of existing water system from Union Pacific R. R. ..................... 2,500,000 15. Acquisition of sites, rights-of-way, easements, etc......................................... 50,000 16. TOTAL ACQUISITION AND CONSTRUCTION COSTS $7,819,000 17. Total incidental expenses, including return of loans from county, working capital, engineering, legal and miscellaneous.......................... 535,000 18. TOTAL ESTIMATED COST OF PROPOSED IMPROVEMENTS..................... $8,354,000 19. Cash Reserve required to cover estimated bond interest during construction and for six months thereafter..................................................... 346,000 20. TOTAL AMOUNT OF PROPOSED BOND ISSUE............................................... $8,700,000