Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
% PROPOSED EXPENDITURES FROM $8,700,000 BOND ISSUE .. News Announcement Release - Item N o. 2 (Compiled by James M. Montgomery, District Consulting Engineer) 1. 30-MI 11 Ion gallon reservoir In West Las Vegas ............................................... $ 710,000 2. I^-Mllllon gallon reservoir at Manganese Ores.......................................... 85,000 3. Control building at Manganese Ores.......................................................... 53,500 4. Booster pumping station on U. S. Highway 95................................................... 197,000 5. Pipeline from Manganese Ores to 30-Mil lion gallon reservoir................... 1,661,500 6. Pipeline from Fremont Street to 30-Milllon gallon reservoir via Charleston Boulevard...................................................................................................... 292,000 7. Miscellaneous improvements to production facilities....................................... 133,000 8. New water wells................. 68,000 9. Improvements to increase capacity of 40-inch pipeline from Lake Mead to Henderson................................................................................ 620,000 10. Miscellaneous additional transmission pipelines................................................ 555,000 11. Miscellaneous additional improvements to distribution system................... 632,000 12. TOTAL ESTIMATED CONSTRUCTION COST...................................................... $5,007,000 13. Contingencies....................................................................................................... 262,000 14. Purchase of existing water system from Union Pacific R. R. ..................... 2,500,000 15. Acquisition of sites, rights-of-way, easements, etc......................................... 50,000 16. TOTAL ACQUISITION AND CONSTRUCTION COSTS $7,819,000 17. Total incidental expenses, including return of loans from county, working capital, engineering, legal and miscellaneous.......................... 535,000 18. TOTAL ESTIMATED COST OF PROPOSED IMPROVEMENTS..................... $8,354,000 19. Cash Reserve required to cover estimated bond interest during construction and for six months thereafter..................................................... 346,000 20. TOTAL AMOUNT OF PROPOSED BOND ISSUE............................................... $8,700,000