Information
Digital ID
upr000071-100
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Form 30-1 (Last Sheet) c. s. 6-31-40*000 WORK ORDER AUTHORITY—DETAIL OF ESTIMATED EXPENDITURES SHEET-----4----OF___±____SHEETS -DEPARTMENT -DIVISION August 24. ___193_ LOCATION: DESCRIPTION: California. ill 55 water meters and second-hand meter boxes fittings in water distribution lines. .iGfenetadj3^anagAs No. 206 State California Valuation Section No._________ Department 17 No. 1434 R, AND E. ACCT. NO. * DESCRIPTION <al Ter and lid re fittings install meter and box * onsflofc lal freight-LCL- krbitrary percentages al cost of 55 meters n place, Including oraoercial freight and rbitrary percentages TOTAL QUANTITY >mla UNIT COST »ach Total 2,25 184 124 Total Estimated Expenditure Estimate By___________ Date .193 Approved. MATERIAL OR TRANSPORTATION CHARGES 1.15 3.25 • 35 15.75 866 866 Lfflff 44 TOTAL CHARGEABLE TO INVESTMENT ACCOUNT s__£90 ^Approved. OPERATING EXPENSES *When labor or material is chargeable to both Investment Account and Operating Expenses show items separately.