Information
Digital ID
upr000067-264
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.connected with said existing walls or said proposed new well m the shop grounds), hut ineluding automotive, shop and other equipment, material and supplies belonging to Las Vegas Land and Water Co., and all additions and betterments ( Ineluding the 14 inch pipe line, tank and pumping facilities under construction to serve Hyde Park and property in the area of Hyde park), as the same exists as of September 1, If52,(and all additions and betterments under construction as the same exist as of September 1, 1952^} In the event any such additions and betterments are under construction as of that date, but have not been completed, you will bear the cost of such additions and betterments in so far as they existed as of September 1, I f ft, and the District will bear the cost of all work done on said additions and betterments subsequent to September 1, 1952. It is understood that additions and betterments under Rule 9 Contracts are excluded from the provision of this subsection BdH.