Skip to main content

Search the Special Collections and Archives Portal

upr000186 148

Image

File
Download upr000186-148.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000186-148
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

La® Vegas - March 10, 1953* Mr* Wm« Reinhardt - Los Angeles The rapid increase in growth in water distribution system at the present time and the increasing demand for im­mediate installation of service connections to recently con­structed homes, as well as the large number of homes which are now under construction or contemplated within the next 90 days, indicate it will be impossible to meet the demand with our present equipment and field forces. The following tabulation shows the number of service connections for which we now have applications and also the number of connections which we anticipate will be required within the next 90 days! Applications on hand as of March 5» 1953*.»..*.^20 Applications anticipated for the next 90 daya..680 Total 1100 We now have three (3) trucks on hand, two of which are used principally on installation of service lines, the other one being used exclusively for repair work, with two crews using one truck each, we are only able to install an average of about 120 service connections per month. In view of the above I have already requisitioned one additional tapping machine and plan on employing two addition­al laborers, in addition to which I would like to request that you arrange WO authority to purchase one (1) additional 3/k Ton Chevrolet pick-up truck. In this connection I am also at­taching hereto Form 2120, to temporarily reclassify two of my present crew, from laborer classification to water service re­pairman, which will provide 1 repairman for each of 3 tapping crews and 1 repairman for general repair work. 1 am advised by the local Chevrolet dealer that a 3/h ton pick-up truck will cost approximately fl865.00. MRMJsn Enc. L.R. Maag