Information
Digital ID
upr000180-100
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.be returned at this time of $5004.66 for which Form 183 Vo.497 is attached hereto. As It was necessary to give the Housing Authority a guaranteed maximum cost, our estimate Included a 20?£ contingency Item. In addition some changes and reductions requested by the Housing Authority reduced the amount of work to be performed. This accounts for the substantial suto being returned to the Housing Authority. Following is data for depreciation purposes: 8" Cast Iron Pipe 2226* $9466.88 6* Cast Iron Pipe 234* 1116,4110.73.220 Service numbers 13650 to 13670 Inclusive have been assigned to this agreement. Also attached is statement of adjustments necessary to complete accounting under WO-677. For Mr. Adamson's information, the water lines, fire hydrants and service connections were constructed in accordance with Dwg. B-563 attached to agreement NLD 2511 dated September 28, 1951 with Nevada Construction Company. W.H.Johnson Attachments