Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.(e) to relocate the pumping station mow located at point HR to a now location shown in solid green square on Exhibit "A-ltt near point 8« (d) when the said new pipe lines have been constructed and the said pumping station relocated as provided in subparagraphs (a)# (b) and (e) hereof. Union Pacific shall have the right to connect the said pipe lines with the existing transmission facilities of the' District so as to render unnecessary the use of the pipe lines shown by broken black and red lines between points marked A and K, A and E, and H and M. When said new pipe lines Shall have been connected into the transmission system of the District, the Union Pacific shall have the right to disconnect from said transmission system and to remove the said pipe lines shown by broken black and red lines between points marked A and K, A and I, and R and HH. Union Pacific shall credit the salvage value, if any, of the material removed, less the cost of removing and disposing of the same, upon the total cost of the work performed by Union Pacific under this Section $. The right to construct said new pipe lines referred to in this Section 3 shall include the right to construct pumps, valves, connections and appurtenances. Section At In the event the District and Union Pacific are able to agree upon the type and nature of the pipelines and Ifti