Skip to main content

Search the Special Collections and Archives Portal

upr000095 62

Image

File
Download upr000095-062.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000095-062
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    (e) to relocate the pumping station mow located at point HR to a now location shown in solid green square on Exhibit "A-ltt near point 8« (d) when the said new pipe lines have been con­structed and the said pumping station relocated as provided in subparagraphs (a)# (b) and (e) hereof. Union Pacific shall have the right to connect the said pipe lines with the existing transmission facili­ties of the' District so as to render unnecessary the use of the pipe lines shown by broken black and red lines between points marked A and K, A and E, and H and M. When said new pipe lines Shall have been connected into the transmission system of the District, the Union Pacific shall have the right to disconnect from said transmission system and to remove the said pipe lines shown by broken black and red lines between points marked A and K, A and I, and R and HH. Union Pacific shall credit the salvage value, if any, of the material removed, less the cost of removing and disposing of the same, upon the total cost of the work performed by Union Pacific under this Section $. The right to construct said new pipe lines referred to in this Section 3 shall include the right to construct pumps, valves, connections and appurtenances. Section At In the event the District and Union Pacific are able to agree upon the type and nature of the pipelines and Ifti