Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Exhibit Witness Work Order No. 1+712 1+728 1+789 UNION PACIFIC RAILROAD COMPANY Summary of Capital Additions to Water Production Facilities at Las Vegas? Nevada, Authorized by Work Orders Expenditure Estimated Made Expenditure Description of Pro.iect Year 1951 Year 1952 Construct 6k feet of water pipe line, consisting of 16 feet of 12 inch and 1+8 feet of 8 inch cast iron pipe, from railroad 2k inch reservoir main to north line of Charleston Blvd. to connect to Las Vegas Land & Water Co. 8 inch cast iron main 2 075.80 Install pump and motor on wells Nos. 8, lO and 11; extend power circuit and rearrange existing piping connections 18 652.06 1 622.23 Cr, Construct booster pumping station including two pumps and 21+00 feet of ll+ inch transite water pipe line to connect with Las Vegas Land & Water Company’s proposed pipe line in Bonanza Road, to serve xrest side district 3*+. 297.10 _______ Total 55 021+.96 1 622,23 Cr