Skip to main content

Search the Special Collections and Archives Portal

upr000265 167

Image

File
Download upr000265-167.tif (image/tiff; 26.38 MB)

Information

Digital ID

upr000265-167
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    \ - 2- we later can revamp the application or modify it with amendments. The important point is to be sure our preliminary application is filed in time. We already have received necessity certificates covering certain projects. It is very probable that further expenditures have been made in connection with these same projects that were not included in the costs and/or estimates that were submitted when these certificates were applied for. In such cases the Managers should advise this office, itemizing the additions and changes so we may decide whether an amendment to the original certificate should be sought. Several projects can be included in one application for a necessity certificate if those projects all are of such a nature that one Army or Navy officer of authority is familiar with them. A memorandum covering necessity certificates already has been sent to those who attended the recent conference of Managers and Accountants. A copy of same is attached hereto for ready reference. Review all your expenditures that have been or will be charged to capital and if it is at all reasonable to consider any of them as being required in the interest of war effort activities, pleaqe provide us with the data. PCN R Chester H. Loveland