Information
Digital ID
upr000218-199
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.% Los Angeles, December 26, 19^7 733^ Mr* R«L* Adamsonj Referring to date water facilities constructed under Work Order 3160-1 were turned over to operation* Please be advised that the reservoir and pipe line in Charleston Blvd* were placed in service on September 23* 19^6; the pump house and pumping equipment turned over to operation on May 1, 19^7* You will note that there is a lapse of time between the date the pipe line was turned over to operation and the date the pump house was placed in operation* This delay was due to non-delivery of sump pump and the checking and adjustment of the big pumps in the pump house* Water service to the pipe line in Charleston Blvd. during that period was furnished through the by-pass lines* lrm:c L * R* liaag W M. J. DEC no 1947